> MUSCAT INT. AIRPORT

> MUSCAT INT. AIRPORT

Sentio Engineering provided Mechanical, Electrical and Plumbing (MEP) Installation Services Works under a Subcontract with Bechtel Enka Joint Venture, for the Muscat International Airport Project. Terminal Facility (460 meters long and 200 meters wide) which is connected to three (3) departure and arrival piers (200 meter, 200 meter and 300 meter). Installation Services consisting of Mechanical, Electrical and Plumbing (MEP) Works. The Main Terminal Facility contains an executive hotel with ninety (90) individual rooms. There is a Maintenance Yard Facility consisting of eight (8) air side, land-side individual buildings.